DuraWattle is designed to be driven over by heavy equipment and maintain its barrier height for 3-5 years in typical conditions. While more frequent traffic from heavy machinery may shorten this lifespan of the product, DuraWattle has been used in high traffic conditions and remained effective. At the Red Lion Hotel Demolition (Terminal 1 Port of Vancouver USA, WA), DuraWattle was installed for over a month and was driven over multiple times by two large trucks and three excavators each day. It did not require replacement or maintenance during the life of the project.

Recent Posts